Registration on construction and reconstruction

If you want to live outside the city in a cozy cottage, be prepared for that, what, except for construction needs, will lie on your shoulders registration of documents for the house – the stage is responsible and inevitable. The point is, that any construction in Ukraine requires an appropriate permit. The document is drawn up before the start of construction works if there is an approved project. The State Architectural and Building Control Inspection is engaged in the production of these official papers.

Construction without the consent of this authority is illegal and punishable by an administrative fine. As for already completed buildings, paperwork with the legalization of self-builds can last for years. In worst cases, buildings are subject to demolition. It is much easier to prevent the development of such a scenario and arrange it permission to build a house in advance.

Stages of registration of permit documentation

To get the desired document in Ukraine, You will need to bypass many instances, collect a set of references, which can push the dream of owning a house quite far into the future. To avoid construction delays, you can seek specialized help. FOP Shandryk will help get a building permit in the shortest possible time, thanks to clearly developed schemes, established contacts, competent specialists. Regardless of the complexity of the construction project / restoration, the company will provide qualified support at all bureaucratic stages.

For buildings with a height of no more 2 floors and a total area of 300 sq.m (giving, garages, outbuildings, farm building) issue a construction permit it is possible according to a simplified procedure. It includes the development of a sketch project, filling out the construction passport and then submitting an application to the territorial body of the architectural and construction inspection.

During the construction of multi-storey buildings, shopping centers, office buildings and other structures, designed for the simultaneous stay of a large number of people, construction permit Kharkiv can be obtained in the following way:

  • drawing up an urban planning calculation;
  • obtaining relevant town planning conditions and restrictions;
  • production of the project, expert assessment;
  • provision of technical, as well as author's supervision;
  • making a declaration on the start of construction works and submitting the document to the Inspection.

The presence of any errors, inconsistencies in the provided list of papers or their lack is grounds for refusing to issue a permit. Ago, so as not to waste time, if you need permission to build a garage , it is better to check once again in advance all the nuances, taking into account the latest legislative changes.

However, by contacting the Shandrik FOP, You will save yourself from all paper problems. Our specialists guarantee a positive solution to the issue of any complexity. Producing permit documents for construction or restoration through the mediation of the company takes no more 7 working days.

The cost of services is discussed individually. Necessary permission to build a private house depends on many parameters of the building. Call us – get a free consultation on all issues!

terms:

7 working days.

cost:

Depends on the amount of work performed.

result:

Declaration on the start of construction works, registered in the State Architectural and Building Inspection.