The procedure for carrying out technical supervision during the construction of an architectural object, approved by resolution Cabinet of Ministers of Ukraine from 11.07.2007 №903. The procedure defines the mechanism of technical supervision during new construction, reconstruction, restoration, capital repair of buildings and structures, as well as technical re-equipment of existing enterprises.
Technical supervision of construction — implementation by the customer (developer) control over compliance with project decisions and requirements of state standards, construction norms and rules, as well as control over the quality of the performed works and their volumes during construction or alteration (including by demolition) urban planning object.
The leading engineer for technical supervision Oleg Ivanovich Shandryk has a certificate of the leading engineer for technical supervision of the construction of buildings and structures in relation to construction objects of the class of consequences (compliance) SS1 (minor consequences), SS2 (average consequences), CC3 (significant consequences).
The importance of technical supervision at construction sites is to monitor the compliance of construction and installation works, constructions, products, materials and equipment by design decision, requirements of state standards, construction norms and rules, technical conditions and other normative documents. Technical supervision also includes quality control of the work performed during the construction or reconstruction of buildings, including their demolition. The engineer for technical supervision of the construction will be able to point out deviations from the design solutions correctly and in a timely manner, disadvantages (defects) and imperfections.
What is construction control for?
Shandryk Oleg Ivanovych is a professional, which supervises technical indicators at the highest level. Organization of technical supervision of construction helps construction companies, investors, customers to receive and control:
- Availability of conditions for designing. Urban planning technical documentation, which is received for construction, must be properly designed and comply with the norms of land development. Technical supervision in construction at the initial stage is very important, since the success of the entire event depends on these documents;
- Preparation of documentation for the start of construction work, obtaining all permits;
- Supervision of building characteristics, preparation of documentation, which will be needed at the time of putting the building into operation;
- Assistance in preparing a package of documents, required to obtain a certificate of conformity. Technical supervision of construction in Chuguyev, Kharkiv and Kharkiv region is accompanied from the very beginning until commissioning.